Energy · needed from Abundance on Earth (2071)
Clean power that runs day and night
Sun and storage can carry most of the load, but a grid is cheaper and safer with some sources that run day and night in any weather. Fission, heat from deep rock and, later, fusion can supply that firm share without carbon. Earth's interior already leaks 47 TW of heat; drills that reach hot rock under every country would let any grid tap it.
The target
Firm clean power of about a tenth of 100 TW: fission plants built on time and on budget, wells into superhot rock almost anywhere, and the first fusion plants, each at a cost close to that of a solar field with storage.
What exists to build on
- The World Nuclear Association counts 444 operable reactors of 406,748 MWe and 81 under construction in November 2026; Ontario's Darlington SMR-1, a 300 MWe small modular reactor, began construction in June 2026. world-nuclear.org, 2026
- Fervo Energy declared commercial operation of the first 33 MW block of Cape Station, its enhanced geothermal plant in Utah, on 30 September 2026, with two more blocks due by January 2027. fervoenergy.com, 2026
- The Clean Air Task Force defines superhot rock as above 400 °C, where one well can yield five to ten times the energy of a conventional geothermal well. catf.us, 2026
- Quaise Energy drilled granite with a 100 kW millimetre-wave gyrotron in a full-scale demonstration near Houston in May 2025. quaise.com, 2025
- On 7 April 2025 the National Ignition Facility put 2.08 MJ of laser light on a target and got 8.6 MJ of fusion energy back, a target gain of 4.13. lmf.llnl.gov, 2025
- Helion's Polaris became the first privately built machine to show measurable deuterium-tritium fusion, announced in February 2026. powermag.com, 2026
- Commonwealth Fusion Systems shipped the first of the 18 superconducting toroidal field magnets for its SPARC tokamak in December 2025. blog.cfs.energy, 2026
What is missing
A tenth of 100 TW is about 25 times the world's whole nuclear fleet of about 407 GWe, and Western fission plants have run years late and billions over budget; the first small modular reactors are only now being built. Enhanced geothermal has just reached its first 33 MW block, where hot rock lies near the surface. Rock above 400 °C, which gives five to ten times the energy per well, needs drills, casings and pipes that survive heat no oil well meets, and the one well that hit magma could not be used for long. Fusion has passed ignition in a laser laboratory, at a target gain of 4.13, but no machine has yet made net electricity.