The Permit Clock

One public docket and one clock for every large project: every agency reviews at the same time, each must answer by a fixed date, and an agency that stays silent past its date is taken to have said yes on standard conditions.

One project at the centre, every reviewing agency around it, each review's clock running down at once.

The Permit Clock

Drag to turn, scroll or pinch to zoom.

How it works

Slow permitting is a coordination failure with no price on delay. Each reviewing body is blamed for a bad approval but bears none of the cost of a slow one, so the safe move for each is to wait, the asymmetric accountability that public choice economics describes. The Permit Clock changes the default. All reviews run in parallel on one shared docket. Each body gets a fixed window by project class, such as 90 days for a design already assessed and 12 months for a new one, and when a window closes without a reasoned refusal the permit is deemed granted on a published set of standard conditions, as the EU Services Directive already does for service licences. To keep the speed fair, the clock starts only after a short, required early hearing where neighbours can still change the design, and a fixed share of the project's revenue goes to a local benefit fund written into the permit, its use decided by the hearing. Challenges must be filed within a short window after the decision, not years later. Standard designs, a type of solar field or a family of transmission towers, are assessed once for all their copies, so each copy needs only a site check.

The first experiment

$3,000,000estimated cost
24months
Goal
Show that a deemed-approval clock with an early hearing and a benefit share cuts decision time for large solar and storage projects without raising later challenges or local opposition.
Setup
Partner with one US state or EU region and 20 to 40 counties or municipalities that agree to run the clock for utility-scale solar and battery projects, with matched counties keeping their current process as controls. Run the shared docket as open software, hold the early hearings, and write the benefit share into each permit.
Measure
Days from a complete application to a decision; the share of decisions that are deemed grants; challenges filed per decision; residents' support, surveyed before and after; megawatts approved.
Succeeds if
Median decision time falls by at least 50 percent against the control counties, while challenges per decision and residents' opposition are no higher.

Run it, or report a result

From the bench to civilization scale

  1. On the benchAbout 5,000 past projects replayed.A simulation of permitting queues built from real US and EU docket records, testing clock lengths, project classes and the deemed-approval default. Proves: Which clock lengths cut delay most, and where a deemed approval would have let a bad project through.
  2. PrototypeAbout 200 projects, a few gigawatts.The clock run for solar and storage in 20 to 40 counties, against matched controls. Proves: Decision time halves without more conflict.
  3. PilotSome 50 gigawatts and thousands of km of line.A whole state or EU member state adopts the clock for every clean energy and grid project, transmission included. Proves: It works for large projects that cross many counties, and it survives court tests.
  4. First plant1 large economy's whole buildout.A national law, or an EU-wide rule, puts every class of energy and industrial project on the clock. Proves: A country can decide at the pace the climb builds.
  5. FleetSome 30 countries.Model laws adopted in many countries, with linked dockets so a line crossing a border runs on one clock. Proves: Continental grids can be permitted as single projects.
  6. Civilization scaleThe buildout to 100 TW, reached in 2071Every jurisdiction on Earth decides on the buildout within a known time, and the same rules carry to the Moon and orbit. Proves: Decisions no longer set the pace of the climb.

What it builds on

  • The EU Services Directive of 2006, Article 13(4), under which an authorisation is deemed granted if the authority does not answer in time. eur-lex.europa.eu, 2006
  • The US FCC's shot clocks for siting wireless equipment, 90 and 150 days from 2009 and 60 and 90 days for small cells from 2018, after which a missed deadline counts against the authority. docs.fcc.gov, 2018
  • SolarAPP+, which issues permits for home solar automatically after an online code check, in more than 350 jurisdictions. gosolarapp.org, 2026
  • The EU's renewables acceleration areas, where permits must be decided within 12 months. eur-lex.europa.eu, 2023
  • The FAST-41 Permitting Council, which puts large US projects' federal reviews on one public timetable. permitting.gov, 2026
  • The US Council on Environmental Quality's 2020 measurement of how long environmental impact statements take. nepa.gov, 2020

What could go wrong, and what to try next

Deemed approval can let a harmful project through when an agency is understaffed rather than satisfied; the fallback is a short, funded right to stop the clock for a reasoned safety concern, and review staffing paid for in proportion to the docket. Courts may refuse silence as consent for environmental decisions, as EU law already does where overriding public interest applies; then the default becomes automatic escalation to a named senior official rather than an automatic yes. Benefit shares can look like buying consent, which is why the hearing, not the developer, decides how the fund is spent.