Materials · needed from Abundance on Earth (2071)
Cement and concrete without the carbon
Concrete is the most used material after water, and its cement is made by roasting limestone. The roasting needs a fuel-fired kiln near 1,450 C, and the limestone itself gives off carbon dioxide as it turns to lime, so even a kiln run on clean power still emits. A world building homes, dams and lines for everyone on Earth needs cement that does neither.
The target
All new cement and concrete for the buildout to 100 TW made without fossil heat and without releasing the carbon in limestone, at today's price and strength, by 2071.
What exists to build on
- The world made about 3,800 million tonnes of cement in 2025, down from 3,900 million in 2024. pubs.usgs.gov, 2025
- US clinker kilns used about 3.61 GJ of mostly fossil fuel per tonne of clinker on site. energy.gov, 2017
- Sublime Systems makes cement electrochemically, without a kiln, and claims 30 to 40 percent lower energy intensity than ordinary Portland cement. sublime-systems.com, 2026
- Sublime Systems, which has placed its cement in real projects since 2023, is building its first kiloton-scale plant; in November 2026 Meta signed a multi-year agreement for priority access tied to at least 180,000 tons of the cement. sublime-systems.com, 2026
- Brimstone's Rock Refinery co-produces cement alongside aluminium, magnesium, titanium and other minerals from a single, globally abundant rock; Amazon is to buy low-carbon cement from its first plant. brimstone.com, 2026
What is missing
The first kiloton-scale clean plants stand against 3,800 million tonnes of cement a year, and builders and codes trust only what has stood for decades. The chemistry is no longer the missing piece; the gaps are scale, qualification in building codes, and clean power cheap enough to replace a kiln's fuel.