Energy · needed from Abundance on Earth (2071)
Terawatt solar factories
Sunlight is the only source on Earth big enough for the next rungs. Panels on 5% of the land could give 465 TW; today 3 TW is installed, and the world's factories can make 1.46 TW of panels a year. To reach 100 TW by 2071 they must grow many times over, and keep getting cheaper by the 26% for each doubling that they have held for fifty years.
The target
Factories that make tens of terawatts of panels a year, enough to cover 5% of the land and give 465 TW, at a module price well below today's 0.09 USD/W, built from materials that do not run out on the way.
What exists to build on
- ITRPV's 2026 roadmap puts module production capacity at about 1,460 GWp at the end of 2025, against 706 GWp shipped that year, at an average spot price of 0.09 US dollars per watt. qualenergia.it, 2026
- IEA PVPS reports that installed PV approached 3 TW at the end of 2025, after about 698 GW was added that year, around 60 percent of it in China. iea-pvps.org, 2026
- Fraunhofer ISE's Photovoltaics Report finds silicon use fell from 16 g per watt in 2004 to about 2 g per watt in 2024, and lists record cells of 35.2 percent (perovskite on silicon) and 28.1 percent (silicon). ise.fraunhofer.de, 2026
- The largest polysilicon makers each run hundreds of thousands of tonnes a year of capacity, led by Tongwei at about 910,000 t and GCL at 480,000 t. bernreuter.com, 2025
- The IEA found electricity is over 40 percent of the cost of making polysilicon, China's share of polysilicon, ingot and wafer output is heading to almost 95 percent, and PV already uses about 10 percent of the world's silver. iea.org, 2022
- Hallam and colleagues project that PV could take over 20 percent of annual silver supply by 2027, and point to copper plating as the way out. doi.org, 2022
- Oxford PV sells perovskite-on-silicon tandem modules at 25 percent efficiency from its line in Brandenburg an der Havel, Germany. oxfordpv.com, 2026
What is missing
Covering 5% of the land means about 1,900 TW of panels, about 40 TW a year from now to 2071: nearly 30 times the factories' 1.46 TW and over 50 times the 706 GW they shipped in 2025, when they ran at about half their capacity because prices had fallen below cost. Every panel still starts as quartz reduced with carbon in arc furnaces and then purified as a gas, the most energy-hungry step in the chain, and most cells still use silver, of which PV already takes a large share of mine supply. A new line takes years and billions of dollars, so growth is held back by capital and by the energy each factory needs before it pays back.
What this project invents for it
How it connects
- It needs
- Enough of every critical mineralPaying for a hundredfold buildout
- It opens the way to
- Computing for everyone, near the limits of physicsA grid that spans the planetStorage for a sun-powered gridSolar power collected in spaceTaking carbon back out of the airFarming in stacked, controlled roomsCarbon nanotubes and graphene by the million tonnesCement and concrete without the carbonSteel, aluminium and copper made with clean powerFlight without fossil carbonShips without fossil fuelDesalination near the energy floor