Industry on the Moon
The Moon is the nearest store of rock, metal and ice outside a deep gravity well. Escaping it takes about a twentieth of the energy per kilogram that escaping Earth does, and there is no air to push through. Industry there mines regolith and polar ice for oxygen, metals and glass, and it is where the first seed factory lands in 2045.
The target
Bases at the poles and on the maria that make oxygen, water, iron, aluminium, silicon and glass from local rock at thousands of tonnes a year, keep working through nights of 14.8 days, and host the 100 t seed factory and the mass drivers that follow it.
What exists to build on
- India's Chandrayaan-3 soft-landed at about 69 degrees south on the Moon on 23 August 2023, the first landing near the lunar south pole. isro.gov.in, 2023
- Firefly's Blue Ghost Mission 1 landed in Mare Crisium on 2 March 2025 and ran more than 14 days of surface operations, the first fully successful commercial Moon landing. fireflyspace.com, 2025
- China's Chang'e 6 collected 1,935.3 grams of rock from the far side of the Moon and returned it to Earth in June 2024. english.news.cn, 2024
- Artemis II carried four astronauts around the Moon and back in nine days in April 2026, the first crewed lunar flight since 1972. nasa.gov, 2026
- The LCROSS impact into the shadowed crater Cabeus found water at 5.6 plus or minus 2.9 percent by mass in the ejected soil (Colaprete and colleagues, Science, 2010). doi.org, 2010
- NASA's MOXIE made 122 grams of oxygen from the Martian air over 16 runs, the first oxygen made from local resources on another world. jpl.nasa.gov, 2023
- NASA Kennedy and Lunar Resources ran molten regolith electrolysis on 25 kg of simulant in vacuum, making oxygen at about 0.07 kg an hour, the kind of pilot plant lunar industry needs, but only on Earth. ntrs.nasa.gov, 2024
- Intuitive Machines' IM-2 carried NASA's PRIME-1 drill and mass spectrometer to the Moon in 2025; both powered on, but the lander tipped over, so no regolith was drilled and measured. nasa.gov, 2025
What is missing
Landings have only become routine in the 2020s, and every mission so far has been a visit. No one has made oxygen or metal on the Moon, mined its ice, or run a plant through a night of 14.8 days. Dust wears seals and fouls radiators, and nothing there is built to work for decades. The rock also has to leave: lunar industry needs a cheap way to throw its products into space.
What this project invents for it
How it connects
- It needs
- Launch at the price of freightRefuelling in orbitLiving off the land in spaceRegular transport between Earth and the MoonPower through the lunar nightMining water in spaceA network around the MoonShared rules for orbits and resourcesAn economy that runs in space
- It opens the way to
- Keeping Earth's heat in balanceMass drivers that throw cargo off a worldHomes in space for millions