Energy · needed from The heat ceiling (2081)

Power through the lunar night

The Moon feeds the first space industry with rock, oxygen and metal, and its days are bright. But each lunar night lasts 14.8 days, cold enough to kill most landers. A mine, a smelter or a seed factory, the first of which starts in 2045, must keep working through it, on power that is made or stored on the Moon rather than shipped from Earth.

A lunar base at dusk, its mirrors folding as the long night falls and its buried heat stores begin to glow.

Power through the lunar night

Drag to turn, scroll or pinch to zoom.

The target

Power for lunar industry through every night of 14.8 days, at any latitude: about 100 kW at the first mine or seed factory from 2045, 1 MW at the first industrial base and 1 GW as the industry grows, with more than 90 percent of the power plant's mass made from lunar material.

What exists to build on

  • NASA's Moon fact sheet gives a synodic month of 29.53 days, so a lunar night lasts about 14.8 Earth days, with equatorial temperatures from about 95 K to 390 K. nssdc.gsfc.nasa.gov, 2024
  • NASA's Fission Surface Power design is a 40 kWe reactor within 6,000 kg, using four Stirling converters and radiators above 400 K, built to last ten years. ntrs.nasa.gov, 2023
  • NASA's KRUSTY test of the Kilopower reactor ran at full power for 28 hours in 2018, for a design rated up to 10 kWe for at least ten years. nasa.gov, 2018
  • NASA plans to land a lunar reactor, LR-1, in 2030, after a more than 20 kWe space reactor demonstration launching in December 2028. nasa.gov, 2026
  • JAXA's SLIM lander survived three lunar nights in 2024 without being designed to, while Firefly's Blue Ghost lasted only several hours into its first night in March 2025. global.jaxa.jp, 2024
  • Astrobotic is developing LunaGrid and NASA's VSAT tall solar towers for the lunar south pole, where some peaks see sunlight almost all the time, rated for nights down to -220 °C. astrobotic.com, 2025

What is missing

One kilowatt through a night of 14.8 days is about 355 kWh; at about 0.2 kWh per kilogram of battery that is nearly 2 t, all shipped from Earth. NASA's reactor design gives 40 kWe for 6 t, so 1 MW would take 25 of them and 150 t, and the first is not due on the Moon before 2030. Tall solar towers work only on a few polar peaks. No lander has run industry through a lunar night, and no part of any power system has yet been made from lunar material.

What this project invents for it

How it connects

It needs
Launch at the price of freightSplitting rock into its elements
It opens the way to
A factory that builds copies of itselfIndustry on the MoonMining water in space