An ocean-crossing power line that is also a hydrogen pipeline: a superconducting magnesium diboride cable cooled by the liquid hydrogen flowing around it, moving gigawatts of electricity and fuel between continents with almost no electrical loss.

It closes the gap inA grid that spans the planet
One cold line crossing a sea floor, then a ring of them linking the continents.

The Cold Spine

Drag to turn, scroll or pinch to zoom.

How it works

Magnesium diboride becomes a superconductor below about 39 K. It is made of cheap elements and drawn into wire by the kilometre. Liquid hydrogen boils at 20 K, so a pipe of it keeps the cable superconducting, and the hydrogen is a second cargo: fuel, and seasonal storage. A direct-current superconducting cable has no resistive loss at all; what costs energy is heat leaking in through the insulation and the work of re-cooling it. Cooling at 20 K takes about fifty times the heat in electric work, so a heat leak of 1 W per metre costs about 50 MW per 1,000 km, half a percent of a 10 GW line, against a few percent for today's best overhead lines. The Spine is a vacuum-jacketed pipe about a metre across laid on the seabed like a gas pipeline: liquid hydrogen flows along a coaxial cable, and stations every 50 to 100 km re-liquefy what boils off. Because the current does the work, not the voltage, the line runs at tens of kilovolts, with small converter stations.

The first experiment

$30,000,000estimated cost
36months
Goal
Measure the heat leak, cooling power and current of a seabed-style superconducting line carrying liquid hydrogen, over a length long enough that per-metre numbers can be trusted.
Setup
A 1 km vacuum-jacketed pipe holding a coaxial magnesium diboride cable in flowing liquid hydrogen, laid in a flooded quarry or a harbour at 50 m depth, with a hydrogen liquefier at one end and a 20 kV, 20 kA direct-current supply. Faults are staged on purpose: a quench, a lost vacuum and a coolant pump trip.
Measure
Heat leak per metre; electric power drawn by the coolers per metre; critical current at 20 to 25 K; hydrogen boil-off; behaviour in each staged fault; cost per metre to lay.
Succeeds if
The line carries 20 kA without a quench for 1,000 hours with a heat leak under 1.5 W per metre at 20 K, and its cooling power, scaled to a 10 GW line, is under 1 percent of that line's power per 1,000 km.

Run it, or report a result

From the bench to civilization scale

  1. On the bench1 km, 400 MW.The 1 km test line under water. Proves: Heat leak, cooling power and fault behaviour that scale per metre.
  2. Prototype50 km, 1 GW.A line across a strait between two islands or two countries, selling both power and hydrogen. Proves: Cooling station spacing, laying method and repairs at sea.
  3. Pilot500 km, 5 GW, with hydrogen alongside.An interconnector across a sea between two grids. Proves: A lower cost per gigawatt-kilometre than conventional subsea cables.
  4. First plant4,000 km, 10 GW.A line from a desert solar zone to a distant market, the length of the Xlinks route. Proves: An intercontinental link that loses less than direct current on copper.
  5. Fleet30 lines of 10 GW, about 100,000 km and 300 GW in all.Spines linking every continent, through the deep ocean where needed. Proves: The grid on which the Sun never sets.
  6. Civilization scale1,000 lines of 10 GW averaging 3,000 km, 10 TW in all.A planetary ring of Spines carrying a tenth of 100 TW and the hydrogen that stores it. Proves: A planet-wide grid at nearly no electrical loss.

What it builds on

  • CERN's cold powering system for the High-Luminosity LHC uses magnesium diboride links rated up to 117 kA, the first system of its kind in the 100 kA class. doi.org, 2025
  • Vysotsky and colleagues tested a 30 m line carrying liquid hydrogen and a magnesium diboride cable together at 20 to 26 K, with about 3,500 A of critical current at 21 K and up to 135 MW of combined chemical and electric power. doi.org, 2015
  • Grant, Starr and Overbye proposed SuperCables carrying superconducting current and liquid hydrogen in the same conduit, as the backbone of a continental energy grid. scientificamerican.com, 2006
  • The EU's BEST PATHS project, led by Red Electrica, tested a magnesium diboride direct-current superconducting link at prototype scale between 2014 and 2018. cordis.europa.eu, 2018
  • The EU's SCARLET project is taking gigawatt-scale superconducting cable systems to the last qualification step before commercial use. scarlet-project.eu, 2026
  • Kawasaki Heavy Industries built Suiso Frontier, the first liquefied hydrogen carrier, with a 1,250 cubic metre tank, in 2021, and ran the first voyage carrying liquid hydrogen between Australia and Japan in February 2022. global.kawasaki.com, 2022

What could go wrong, and what to try next

A long superconducting line stores a lot of magnetic energy and must survive a quench or a lost vacuum without damage; the design splits it into sections that can each warm up safely. Hydrogen beside high voltage adds a fire risk at landfalls, so converter stations and hydrogen terminals are kept apart, and helium gas cooling is the fallback if hydrogen proves too hard. Laying a metre-wide rigid pipe across ocean trenches may be impractical; then routes hop along shelves and islands, or use flexible corrugated cryostats like today's superconducting cables. If deep-sea repairs take months, lines must be laid in pairs.